A live IPERC matrix, in the method each country requires.
Connected to every control, training record, work permit and report. For SST, SSOMA, HSEQ and PRL.
2,293
The health and safety screen, with demonstration data.

Building the matrix is not the problem. Keeping it up to date is.
One file per site and per country
Nobody sees the group’s risk.
Disconnected from what happens
Accidents, measurements and reports do not update it.
Controls that cannot be proven
No date, no owner, no evidence.
The matrix at the centre. Everything else connected to it.
Hover or tap an item to see what it feeds and what it requires.
Feed the matrix
IPERC matrix
- Hazard from the common catalogue
- Initial risk
- Controls with an owner
- Residual risk
The matrix requires and controls
Initial and residual risk, on the country’s scale.
- Each line with its hazard, job, controls and residual risk.
- Each company uses the method of its own regulation. What is not comparable is not added up.
- Printed in the format the inspector requires, from live data.
The same hazard, assessed as each country requires.
No mixing of scales. Each company in the group is assessed with its own country’s method; adding them together would produce a meaningless figure.
The work permit cannot be signed if training or fitness is missing.
Try it: switch the worker and tick the checks.
Electrical switching · 10 kV substation
PT-PE-2026-0001The requester cannot authorise: nobody authorises their own hazardous work.
From the risk to the measure, and from the measure to proof that it works.
From the accident report to the index, and back to the matrix.
What the inspector asks for, by country and in one click.
Example: Peru, Law 29783 and DS 005-2012-TR, art. 33. Change the country and the index changes; the data is not loaded again.
Connected to HR, to your ERP and to DSA Core 360.
HR and payroll
Headcount, positions, hires and leavers: the basis for what is required of each person.
Your ERP
SAP, Dynamics 365, Oracle, Sage or Odoo, through REST web services and webhooks. Scope agreed before starting.
DSA Core 360
Operations and compliance without duplicating master data or reloading contractor documentation.
Next step: a working session on your IPERC matrix.
- Your current matrix and the method per country
- Critical positions and first wave
- Training and channels to activate